Malin Road Extension – Feasibility Study Report
A study was conducted in 2010 to evaluate the extension of Malin Road between its current southern terminus and Warren Avenue in the vicinity of the existing industrial park and the SEPTA station. The consultant team for this study was lead by McMahon Associates. Individual sections of the resulting report can be viewed by clicking on the links below. Please note that some of the files are very large and may take a longtime to download. Also note that the three Chapter ’2′ files have short redacted sections at the front and / or rear of the file. Nothing has been removed from the report. The sections are simply formatted to start / end with the text pertinent to the section.
- Introduction
- Existing Conditions – Land Use Context
- Existing Conditions – Environmental Conditions
- Existing Conditions – Traffic Conditions
- Alternative Alignments
- Projected Transportation Conditions
- Performance Measures
- Implementation Plan
- Conclusions
- Appendix A - Environmental Correspondence
- Appendix B - Capacity, Level-of-Service Methodology
- Appendix C - Existing LoS Worksheet
- Appendix D - Future LoS Worksheet
- Appendix E - Engineering Conceptual Opinion of Costs
- Chester County Planning Commission Letter