Malin Road Extension - Feasibility Study Report

A study was conducted in 2010 to evaluate the extension of Malin Road between its current southern terminus and Warren Avenue in the vicinity of the existing industrial park and the SEPTA station. The consultant team for this study was lead by McMahon Associates. The large resulting report can be viewed in sections by clicking on the links below; large files are noted by megabyte size(MB) indicators:

             ** Chester County Letter **

  1. Introduction ( 1 MB)
  2. Existing Conditions (24 MB)
  3. Alignment Alternatives (14 MB)
  4. Projected Transportation Conditions (11 MB)
  5. Performance Measures (2 MB)
  6. Implementation Plan (3 MB)
  7. Conclusions (1.4 MB)

Appendix A Environmental Correspondence (1 MB)

Appendix B Capacity Analysis Methodology

Appendix C Existing Capacity Analysis

Appendix D Future Capacity Analysis (14 MB)

Appendix E Cost Calculations